NuVista Energy

13 Years of Integrated Development Support (2012–Present)

Over more than a decade, Aztec Engineering has served as a trusted engineering partner to NuVista Energy, providing deeply integrated support across all phases of asset development. Since 2012, our team has successfully tied in 405 producing wells while installing 757 km of pipeline infrastructure spanning gathering, fuel gas, lift gas, instrument air, and produced water systems. Our facilities work has included eight compressor installations, two source water wells, one water injection well, and two water degassing facilities. Supporting this volume of development also required rigorous regulatory coordination, with 114 ABSA registrations completed over the program’s life. Throughout this engagement, our teams have successfully navigated the unique challenges of high sour production environments and operations in close proximity to residents — demonstrating Aztec’s commitment to safe, compliant, and community-conscious project delivery.

Wells Tied In — 405 Total

Year Producing Wells
2013 8
2014 21
2015 16
2016 35
2017 21
2018 28
2019 34
2020 10
2021 39
2022 57
2023 77
2024 35
2025 24

757 km of Pipeline Installed

Commodity Distance
Gathering 337 km
Fuel Gas 223 km
Lift Gas 83 km
Instrument Air 64 km
Produced Water 50 km