10-16 Gas Processing Facility

Phase 1 – 100MMSCFD Gas Processing and Compression Facility

Aztec Engineering Inc. designed, procured and played a supporting role in the fabrication and construction of a 100MMSCFD sour gas processing facility with up to 18,000 bbl/day of liquid handling capabilities. The facility was designed to accommodate over 300MMSCFD of future gas processing and compression capacity upon full build out.

Major Equipment: Modular turnkey inlet separator packages, inlet separation, LP compression, HP compression, gas sweetening unit, dehydration, condensate degassing vessel, water storage tanks, condensate and water pump packages.

  • Pre-built modular piperacks and well packages accelerated construction timeline
  • Aztec was able to provide local engineering presence during and after construction of the facility, working with and advising onsite crews.