Kakwa South Pipeline Integration

24” Sales gas and & 6” NGL pipeline

  • Aztec Engineering Designed, procured all pipeline materials and organized construction on site
  • Capable of transporting 785e3m3/day of dehydrated natural gas
  • Designed of CSA Grade 483 Cat II linepipe to reduced material costs while maintaining strength
  • 2km in length

 

HDPE Fresh Water Network

  • Designed to handle 20,000m3/day of fresh water with peak rates of 32,000m3/day
  • Spans over 28 km
  • System is fully piggable
  • Modular pump packages minimizes rental costs and allows greater flexibility with future frac operations

Project Gallery

Ready to Move Your Project Forward?

Partner with Aztec Engineering Inc. for expert guidance, practical solutions, and dependable project support from start to finish.